Engineering planning tool
Water supply planning for data center campuses, from demand forecast to negotiation position
Build defensible planning-level analysis for cooling water demand, supply portfolios, treatment trains, transmission and storage infrastructure, permitting, risk and lifecycle cost — with every assumption visible and editable.
- 13
- Analysis modules
- 11
- Cooling technologies
- 27
- Permits tracked
- 30 yr
- Lifecycle NPV
What the planner covers
Demand forecasting
WUE/PUE energy-basis demand, peaking factors, cooling tower mass balance and year-by-year buildout.
Cooling technology screening
Weighted comparison of 11 cooling systems on water, energy, capital, O&M and site fit.
Water source evaluation
Blended supply portfolios with reliability, quality, permitting and lead-time scoring.
Supply / demand balance
Firm capacity vs max-day demand, drought and outage stress testing.
Treatment screening
Preset treatment trains, recovery, residuals and complexity scoring by source water.
Infrastructure sizing
Pipeline diameter and headloss, pump station horsepower, storage volume components.
Cost estimating
Class 4/5 capital build-up, O&M, escalation and 30-year lifecycle NPV.
Risk scoring
15 weighted planning risk categories with evidence, mitigation and owner tracking.
Permitting register
27 approvals with triggers, required studies, durations and status.
Municipal negotiation
Position tracking on rates, capacity, fees and readiness scoring.
Community engagement
Stakeholder sentiment factors and benefit commitment documentation.
Scenario comparison
Base, conservative, aggressive and sensitivity scenarios side by side.
Reporting and export
Print-ready reports, CSV data extracts and Markdown summaries.
Engineering use limitations
This tool provides planning-level screening, feasibility, and conceptual cost estimates for data center water infrastructure. It does not replace site-specific engineering analysis, hydraulic modeling, water quality testing, permitting review, legal review, or final design by licensed professionals. All unit costs, sizing assumptions, and recommendations must be reviewed and validated using local data, current bid prices, applicable regulations, and professional judgment.
DC SmartWater Planner